TIMELINE
----------------------------------------------------------------
FAISALABAD INTERNATIONAL AIRPORT - (FIAP)
THE AIRPORT TRACES INTO ORIGINS NOT TOO FAR INTO THE PAST. THE FOUNDER OF THE CITY
DECIDED THAT FAISALABAD HAD A STRATEGIC POSITION WITHIN THE BRITISH EMPIRE.
1942
- CONSTRUCTION OF A BRICKED STRIP MEASURING
-
THE LOCAL GOVERNMENT GAVE PERMISSION FOR THE CONSTRUCTION OF A BRICKED STRIP MEASURING
5000' BY 100'. VARIOUS REGIONAL AIRCRAFT USED THE STRIP FOR A SHORT TIME HOWEVER
AS TECHNOLOGY PROGRESSED THE AIRSTRIP BECAME QUITE OUT-DATED.
1958
- BEGAN DOMESTIC OPERATIONS
-
THE NATIONAL FLAG CARRIER, PAKISTAN INTERNATIONAL AIRLINES BEGAN DOMESTIC OPERATIONS
IN 1958 OPERATING VARIOUS FLIGHTS FROM KARACHI TO EXPAND ON EXPORTS AND IMPORTS
FROM THE CITY.
1965
- BRICKED AIRSTRIP WAS RE-BUILT USING BITUMEN TO MEET STANDARDS
-
IT WAS NOT UNTIL 1965, THE BRICKED AIRSTRIP WAS RE-BUILT TO MEET STANDARDS AT THAT
TIME. THE SURFACE WAS BUILT USING BITUMEN AND THE LENGTH OF THE RUNWAY INCREASED
TO 9000' X 100' TO ALLOW THE AIRPORT TO HANDLE LARGER JET FUELED AIRCRAFT.
1986
- EXTENSION OF TERMINAL BUILDING
-
IN 1986 THE TERMINAL BUILDING WAS EXTENDED TO ACCOMMODATE GREATER NUMBER OF PASSENGERS
AND MEET FUTURE GROWTH IN AIR TRAVEL FOR THE CITY.
1989-1990
- Boing Apron and Taxiway
-
In 1989-90 Boing Apron and Taxiway was started and widen up to 300 ft x 300 ft to
accommodate Air Bus A-300.
1991
- EXTENSION OF TERMINAL
-
IN 1991, THE OLD RUNWAY WAS WIDENED, STRENGTHENED AND EXTENDED REACHING DIMENSIONS
OF 9270' BY 150' WITH SURFACE BITUMEN TO ACCOMMODATE AIRBUS AIRCRAFT SUCH AS AIRBUS
310S.
1998
- STARTING OF DIRECT HAJJ OPERATION
-
IN 1998, DIRECT HAJJ OPERATIONS WERE STARTED FROM THE AIRPORT ANNUALLY, ALLOWING
MORE FLIGHTS AND TRAFFIC GROWTH FOR THE AIRPORT.
2015-2016
- EXPANSION OF TERMINAL BUILDING, APRON AND TAXIWAY
-
ON 9 APRIL 2015, THE AIRPORT WAS INSPECTED BY SHUJAAT AZEEM (SAPM), AIR MARSHAL
(RETD) MUHAMMAD YOUSAF (DIRECTOR GENERAL OF PAKISTAN CIVIL AVIATION AUTHORITY)AND
RANA MOHAMMAD AFZAL KHAN (MEMBER OF PARLIAMENT, MNA). IT WAS ANNOUNCED THAT THE
AIRPORT WILL BE UPGRADED TO MEET INTERNATIONAL STANDARDS OF THE IATA/ICAO.THE AIRPORT
WILL UNDERGO THE FOLLOWING WORK:
- EXTENSION OF THE CURRENT PASSENGER TERMINAL WITH SEPARATE LOUNGES FOR DOMESTIC AND
INTERNATIONAL OPERATION
- CONSTRUCTION OF A NEW CARGO COMPLEX
- EXTENSION & UPGRADING OF THE CURRENT RUNWAY TO HANDLE LARGER AIRCRAFT
- CONSTRUCTION OF A NEW TAXIWAY
- RENOVATION OF THE AIRCRAFT STANDS (APRON)
- RENOVATION OF THE ARRIVALS/DEPARTURE/BUSINESS CLASS LOUNGES